Submission in response to Infrastructure NSW’s data centres consultation paper

Date:
May 8, 2026
Download
PDF (293 KB)
Type:
Topics:

While data centres have been around for decades, development is accelerating, with a wave of data centre proposals drawing community attention and concern. This increase is driven by the rapid rise of AI, strong expectations about future digital demand and a desire to capitalise on the economic gains. It creates both opportunity and substantial risk to households and communities. The risks include inefficient investment, higher long-term costs for water and energy, potential delays to the transition, and unacceptable impacts on energy and water services. 

While properly regulated and well-integrated, data centres can help support a broader digital economy and contribute to energy system efficiency, flexibility, and reliability. This requires a robust framework to be developed and implemented upfront.  

That’s why our submission to Infrastructure NSW’s Data Centre Consultation Paper recommends development of a comprehensive regulatory framework, and shift in the way data centre projects are assessed to focus on all aspects of their potential impact and public value. This includes: 

  • Assessments that consider the full impact of a project on the community beyond rubbery headline figures on jobs or investment; 
  • robust and transparent community engagement requirements; 
  • linking energy and water efficiency standards to development approval; 
  • disclosure requirements that assess and mitigate impacts on system loads; 
  • matched renewable energy requirements; 
  • measures to ensure neutral cost impact on energy and water consumers, and; 
  • operational obligations to support system reliability, affordability and emissions reduction. 

What’s next?  

A NSW Parliamentary inquiry is also considering these issues, alongside similar investigations at a Commonwealth level, and by the Australian Energy Market Commission. We’ll continue engaging in these processes to help ensure data centre development involves the community, and happens in a way that meets their needs and protects their interests.  

Wins